IAV TENDER WEB

Archived Tenders


PREQUALIFICATION - Ventilation work in the CCC


5308-2600-003T

Read more

Grjótháls 7-11


Uppsteypa (4113-001T)


4113-001T

Íslenskir aðalverktakar óska eftir tilboðum í uppsteyu á vöru- og skrifstofuhúsi að Grjóthálsi 7-11 í Reykjavík

Read more


Production and delivering of AHU´s (5308-2600-002T)


VE01

Tender of Ventilation systems. "Production and delivering of AHU´s to Concert and Conference Centre (CCC) in Reykjavík"

Read more

Concert and Conference Center


Tender - Facade ( 5306-002T )


TP-E01

The new Concert and Conference Centre (CCC) is under construction in the old city harbour in Reykjavik, Iceland. The Concert and Conference Centre will contain a main Concert Hall seating about 1800, a smaller Rehearsal Hall seating 450 and a Conference Hall seating 750. The facade is an artistic work created by the artist Ólafur Elíasson in cooperation with Henning Larsen Architects and the engineers Rambøll, Switbert Greiner and Ralf Rache. The Concert and Conference Centre Works comprises one building, with three different types of facades. - Quasi Brick façade, - Cut Quasi brick facade - Conventional glazed facade The facilities will be opened in December 2009 for concerts, conferences and related events. The work is described in enclosed documents to design and build one of the most prestigious facade ever built.

Read more

Concert and Conference Center


Addendum - Performance equipment TE1, TE3, TE4, TE6, TE7


5308-2710-7

Read more


PERFORMANCE EQUIPMENT; Demountable Platform Turntable System ( 5308-2710-006T )


TE7

PERFORMANCE EQUIPMENT; Demountable Platform Turntable System Tender Package TE-7

Read more

Concert and Conference Center


PERFORMANCE EQUIPMENT; Chorus Wagon System ( 5308-2710-005T )


TE6

PERFORMANCE EQUIPMENT; Chorus Wagon System Tender Package TE-6

Read more

Concert and Conference Center


PERFORMANCE EQUIPMENT; Lifts ( 5308-2710-004T )


TE4

PERFORMANCE EQUIPMENT; Lifts Tender Package TE-4

Read more

Concert and Conference Center


PERFORMANCE EQUIPMENT; Motorized Acoustic Banners (5308-2710-003T)


TE3

PERFORMANCE EQUIPMENT; Motorized Acoustic Banners Tender Package TE-3

Read more

Concert and Conference Center


Invitation for Prequalification – Performance Equipment (5308-2710-001T)


CCC-005

The new Concert and Conference Centre (CCC) is under construction in the old city harbour in Reykjavik, Iceland. The Concert and Conference Centre will consist of a main Concert Hall seating about 1800, a smaller Rehearsal Hall seating 450 and a Conference Hall seating 750, all on level 2, and the 4th Hall on plan level 1. In addition there will be smaller meeting rooms, breakout rooms, exhibition area, restaurant, VIP rooms and offices and rehearsal facilities for the Icelandic Symphony Orchestra. The Concert and Conference Centre will be designed and constructed with an emphasis on a top-quality acoustic environment, with technical facilities of high standard. The facilities will be opened in December 2009 for concerts, conferences and related events. IPC intends to prequalify contractors for the following five tender packages under the Performance Equipment Project in the National Concert and Conference Centre in Reykjavík, Iceland. The new Concert and Conference Centre (CCC) is under construction in the old city harbour in Reykjavik, Iceland. The Concert and Conference Centre will consist of a main Concert Hall seating about 1800, a smaller Rehearsal Hall seating 450 and a Conference Hall seating 750, all on level 2, and the 4th Hall on plan level 1. In addition there will be smaller meeting rooms, breakout rooms, exhibition area, restaurant, VIP rooms and offices and rehearsal facilities for the Icelandic Symphony Orchestra. The Concert and Conference Centre will be designed and constructed with an emphasis on a top-quality acoustic environment, with technical facilities of high standard. The facilities will be opened in December 2009 for concerts, conferences and related events. Iceland Prime Contractor hf. (IPC) is the main contractor for the construction of the Concert and Conference Centre in Reykjavík

Read more

Concert and Conference Center


PERFORMANCE EQUIPMENT; Canopy and Control Systems (5308-2710-002T)


TE1

PERFORMANCE EQUIPMENT; Canopy and Control Systems Tender TE-1

Read more

Sudurlandsbraut 58-62


Ground finish (4107-001T)


4107/003

Material and work at Sudurlandsbraut 58-62

Read more


Concert and Conference Centre ( CCC ) (5306-001T)


CCC-004

Quasi brick facade. Prelude tender.

Read more


Structural Steel (5303-002T)


CCC-003

Prebid for providing and delivering of Structural Steel. Total amount 2.200 tons.

Read more


Concrete Tender (5303-001T)


CCC-001

The seller shall produce and deliver concrete to Concert and Conference Centre in accordance with the delivery plan. Total quantity of concrete is estimated to be 34.000 m3 and shall be delivered from December 2006 till April 2008. This can be extended if an amendment is signed regarding further development of EHP.

Read more



 

Flýtileiðir