PREQUALIFICATION - Ventilation work in the CCC
5308-2600-003T
Read more
Grjótháls 7-11
Uppsteypa (4113-001T)
4113-001T
Íslenskir aðalverktakar óska eftir tilboðum í uppsteyu á vöru- og skrifstofuhúsi að Grjóthálsi 7-11 í Reykjavík
Read more
Production and delivering of AHU´s (5308-2600-002T)
VE01
Tender of Ventilation systems.
"Production and delivering of AHU´s to Concert and Conference Centre (CCC) in Reykjavík"
Read more
Concert and Conference Center
Tender - Facade ( 5306-002T )
TP-E01
The new Concert and Conference Centre (CCC) is under construction in the old city harbour in Reykjavik, Iceland. The Concert and Conference Centre will contain a main Concert Hall seating about 1800, a smaller Rehearsal Hall seating 450 and a Conference Hall seating 750.
The facade is an artistic work created by the artist Ólafur Elíasson in cooperation with Henning Larsen Architects and the engineers Rambøll, Switbert Greiner and Ralf Rache.
The Concert and Conference Centre Works comprises one building, with three different types of facades.
- Quasi Brick façade,
- Cut Quasi brick facade
- Conventional glazed facade
The facilities will be opened in December 2009 for concerts, conferences and related events.
The work is described in enclosed documents to design and build one of the most prestigious facade ever built.
Read more
Concert and Conference Center
Addendum - Performance equipment TE1, TE3, TE4, TE6, TE7
5308-2710-7
Read more
PERFORMANCE EQUIPMENT; Demountable Platform Turntable System ( 5308-2710-006T )
TE7
PERFORMANCE EQUIPMENT; Demountable Platform Turntable System
Tender Package TE-7
Read more
Concert and Conference Center
PERFORMANCE EQUIPMENT; Chorus Wagon System ( 5308-2710-005T )
TE6
PERFORMANCE EQUIPMENT; Chorus Wagon System
Tender Package TE-6
Read more
Concert and Conference Center
PERFORMANCE EQUIPMENT; Lifts ( 5308-2710-004T )
TE4
PERFORMANCE EQUIPMENT; Lifts
Tender Package TE-4
Read more
Concert and Conference Center
PERFORMANCE EQUIPMENT; Motorized Acoustic Banners (5308-2710-003T)
TE3
PERFORMANCE EQUIPMENT; Motorized Acoustic Banners
Tender Package TE-3
Read more
Concert and Conference Center
Invitation for Prequalification – Performance Equipment (5308-2710-001T)
CCC-005
The new Concert and Conference Centre (CCC) is under construction in the old city harbour in Reykjavik, Iceland. The Concert and Conference Centre will consist of a main Concert Hall seating about 1800, a smaller Rehearsal Hall seating 450 and a Conference Hall seating 750, all on level 2, and the 4th Hall on plan level 1. In addition there will be smaller meeting rooms, breakout rooms, exhibition area, restaurant, VIP rooms and offices and rehearsal facilities for the Icelandic Symphony Orchestra. The Concert and Conference Centre will be designed and constructed with an emphasis on a top-quality acoustic environment, with technical facilities of high standard. The facilities will be opened in December 2009 for concerts, conferences and related events.
IPC intends to prequalify contractors for the following five tender packages under the Performance Equipment Project in the National Concert and Conference Centre in Reykjavík, Iceland.
The new Concert and Conference Centre (CCC) is under construction in the old city harbour in Reykjavik, Iceland. The Concert and Conference Centre will consist of a main Concert Hall seating about 1800, a smaller Rehearsal Hall seating 450 and a Conference Hall seating 750, all on level 2, and the 4th Hall on plan level 1. In addition there will be smaller meeting rooms, breakout rooms, exhibition area, restaurant, VIP rooms and offices and rehearsal facilities for the Icelandic Symphony Orchestra. The Concert and Conference Centre will be designed and constructed with an emphasis on a top-quality acoustic environment, with technical facilities of high standard. The facilities will be opened in December 2009 for concerts, conferences and related events.
Iceland Prime Contractor hf. (IPC) is the main contractor for the construction of the Concert and Conference Centre in Reykjavík
Read more
Concert and Conference Center
PERFORMANCE EQUIPMENT; Canopy and Control Systems (5308-2710-002T)
TE1
PERFORMANCE EQUIPMENT; Canopy and Control Systems
Tender TE-1
Read more
Sudurlandsbraut 58-62
Ground finish (4107-001T)
4107/003
Material and work at Sudurlandsbraut 58-62
Read more
Concert and Conference Centre ( CCC ) (5306-001T)
CCC-004
Quasi brick facade.
Prelude tender.
Read more
Structural Steel (5303-002T)
CCC-003
Prebid for providing and delivering of Structural Steel. Total amount 2.200 tons.
Read more
Concrete Tender (5303-001T)
CCC-001
The seller shall produce and deliver concrete to Concert and Conference Centre in accordance with the delivery plan. Total quantity of concrete is estimated to be 34.000 m3 and shall be delivered from December 2006 till April 2008. This can be extended if an amendment is signed regarding further development of EHP.
Read more