Konstruktion

64.112947,-21.773517|/media/27837/Mogginn.jpg?w=250&h=109&mode=crop|Newspaper officebuilding|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/newspaper-officebuilding/| The buliding is 3,900 square meters in size, isolated from the outside and lined with tiles. Roofing plates with tare cardboard and isolation of the above. On top of the isolation imposed gravel disca...|terrain | blue | Yderligere
64.154673,-21.934871|/media/27780/Grandi_frystigeymsla01.jpg?w=250&h=109&mode=crop|Freezer storage building for HB Grandi|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/freezer-storage-building-for-hb-grandi/| IAV and HB Grandi, one of the largest fishing companies in Iceland cooperated in building a freezer storage.|terrain | blue | Yderligere
63.880287,-22.449222|/media/8550/120ver005.jpg?w=250&h=109&mode=crop|Blue lagoon|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/blue-lagoon/| The building by the Blue lagoon is the first phase of constructions that accommodates health service and tourist service facilities by the lagoon.|terrain | blue | Yderligere
64.149509,-21.862208|/media/27784/Voruhotel.jpg?w=250&h=109&mode=crop|Warehouse building for Eimskip|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/warehouse-building-for-eimskip/| A turnkey project, design management, earth work, concrete work, interior and exterior finishes and landscaping of this warehouse building for Eimskip in Sundahofn, Reykjavik.|terrain | blue | Yderligere
64.162337,-21.678555|/media/27786/Kjuklingaslaturhus_01.jpg?w=250&h=109&mode=crop|Poultry slaughterhouse in Mosfellsbaer|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/poultry-slaughterhouse-in-mosfellsbaer/| A turnkey project, design management, earth work, concrete work, interior and exterior finishes and landscaping of this poultry slaughterhouse and processing plant at Voluteigur 2 in Mosfellsbaer.|terrain | blue | Yderligere
64.120271,-21.80164|/media/27789/Orkuveitan_01.jpg?w=250&h=109&mode=crop|Headquarters of Reykjavik Energy|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/headquarters-of-reykjavik-energy/| Interior finishes of the headquarters of Orkuveita Reykjavikur. The building is approx. 14.000 m² and is divided into two separate buildings.|terrain | blue | Yderligere
64.145661,-21.898687|/media/27792/Borgartun26_01.jpg?w=250&h=109&mode=crop|Office building - Borgartún 26|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/office-building-borgartun-26/| Borgartun 26 is divided into two parts of different height, five and eight floors and on top of the elevator shaft there is a technical space of approx. half a floor.|terrain | blue | Yderligere
64.134514,-21.869232|/media/27794/Glaesibaer_01.jpg?w=250&h=109&mode=crop|Office building Glæsibær|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/office-building-glaesibaer/| The office building in Glæsibær is approx. 10.000 m², eight floors and two basement floors. The first three floors are used as a health centre by the Blue lagoon but most of the other floors are used ...|terrain | blue | Yderligere
64.142358,-21.891056|/media/27796/Grand_Hotel_01.jpg?w=250&h=109&mode=crop|Grand Hotel Reykjavik|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/grand-hotel-reykjavik/| The building is more than 14.000 m² on fourteen floors i.e. a basement, 12 whole floors, indented penthouse floor and a small area on top of the elevator shafts, that is used as a panorama meeting roo...|terrain | blue | Yderligere
64.147522,-21.942502|/media/27799/GrandHotelCentrum1.jpg?w=250&h=109&mode=crop|Hotel Reykjavik Centrum|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/hotel-reykjavik-centrum/| The hotel is placed in a renovated old building. Adalstraeti 16 is the oldest part of the building, built 1764. On each side of the building new buildings were built that are replicas of old famous bu...|terrain | blue | Yderligere
64.138798,-21.938307|/media/27801/Esso_05.jpg?w=250&h=109&mode=crop|N1 Servicestations|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/n1-servicestations/| IAV have rebuilt 5 N1 (former ESSO) Servicestations in the capitol area.|terrain | blue | Yderligere
64.122922,-21.804857|/media/27806/Olgerdin.jpg?w=250&h=109&mode=crop|ÖL - brewery|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/ol-brewery/| In August 2009 IAV competed building a 12.500 sqm storage- and officebuilding for the brewery Egill Skallagrimsson in Reykjavik.|terrain | blue | Yderligere
64.155381,-21.95381|/media/27807/Lydi.jpg?w=250&h=109&mode=crop|Höfuðstöðvar og verksmiðja Lýsi hf|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/hofudstodvar-og-verksmidja-lýsi-hf/| The new processing plants inaugurated in the autumn of 2005 and spring 2012 elevated LYSI to the status of one of the most advanced processors of its kind in the world.|terrain | blue | Yderligere
64.249416,-15.195127|/media/27808/Frystigeymsla_Skinney.jpg?w=250&h=109&mode=crop|Freezingwarehouse Skinney-Thinganes|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/freezingwarehouse-skinney-thinganes/| This construction included all eart work, concrete fundation, eraction of steel frames and cladding. The building will hold up to 4000 MT of frozen produce, mainly fish.|terrain | blue | Yderligere
65.137301,-13.74178|/media/27809/Frystigeymsla_Neskaupsstad.jpg?w=250&h=109&mode=crop|Freezing warehouse in Neskaupsstadur|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/freezing-warehouse-in-neskaupsstadur/| On 21 October 2005, IAV and Síldarvinnslan hf. in Neskaupstadur signed a contract for construction of 7000 sqm of freezingstorage to be built in Neskaupstadur, east Iceland.|terrain | blue | Yderligere
63.977681,-22.577932|/media/18130/Verne.jpg?w=250&h=109&mode=crop|Verne Date Centre|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/verne-date-centre/| |terrain | blue | Yderligere
64.146477,-21.925775|/media/27810/Vatnsstigur14.jpg?w=250&h=109&mode=crop|Apartments - interior finishing|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/apartments-interior-finishing/| This is a cooperation between IAV and Landey, the owner of the building. The scope of our work was interior finishing of 7 apartments at Vatnstigur 14, Reykjavik.|terrain | blue | Yderligere
64.151047,-21.989553|/media/43819/Hrolfsskalamelur2-8_01.jpg?w=250&h=109&mode=crop|Apartments Hrolfsskalamelur|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/apartments-hrolfsskalamelur/| This is a cooperation between IAV and Landey, the owner of the building.|terrain | blue | Yderligere
64.144584,-21.896307|/media/27842/Soltun_Manatun_1_afangi.jpg?w=250&h=109&mode=crop|Apartments Soltun & Manatun|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/apartments-soltun-manatun/| A turnkey project of building 200 exclusive luxury apartments at Soltun and Manatun in the heart of Reykjavik. The buildings are six and seven floors concrete cast on site and with a metal cladding.|terrain | blue | Yderligere
64.075268,-21.972993|/media/27844/Herjolfsgata.jpg?w=250&h=109&mode=crop|Apartments in Hafnarfjördur|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/apartments-in-hafnarfjordur/| The buildings are well situated at the edge of untouched lava with an ocean view. The lava behind the buildings is conserved, so when designing the building site it was important to let the buildings ...|terrain | blue | Yderligere
64.146528,-21.925276|/media/27846/Lindargata.jpg?w=250&h=109&mode=crop|Apartment building – Lindargata 27|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/apartment-building-lindargata-27/| The building is an exclusive eight floor apartment building. It accommodates 27 luxury apartments and six garages. IPC’s marketing department sold all the apartments.|terrain | blue | Yderligere
64.146546,-21.924479|/media/43795/Lindagata27_1.jpg?w=250&h=109&mode=crop|Lindargata 37 – Exterior work|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/lindargata-37-exterior-work/| The building, Lindargata 37, had previously been built by ÍAV. The concrete work was finished and the windows and exteriors doors had been installed.|terrain | blue | Yderligere
64.147061,-21.924157|/media/27849/101_Skuggahverfi_annar_afangi.jpg?w=250&h=109&mode=crop|Apartments Skuggi|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/apartments-skuggi/| This is phase 2 of three for this project which consists of 97 apartments in a 19 stories high bulding. The area is called Shadow district downtown Reykjavik. These buldings are among the highest in I...|terrain | blue | Yderligere
64.147061,-21.924157|/media/27849/101_Skuggahverfi_annar_afangi.jpg?w=250&h=109&mode=crop|101 Skuggi apartments, 1. phase|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/101-skuggi-apartments-1-phase/| IAV was commisioned to refurbish the whole tiling system of the building, about 3500 sqm as well as resolving leeks by windows at several places.|terrain | blue | Yderligere
64.145119,-21.897185|/media/27852/Borgartun_luxusibudir.jpg?w=250&h=109&mode=crop|Luxury apartments|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/luxury-apartments/| This residential building is a traditional reinforced concrete construction with outside insulation and cladded with colored aluminium plates.|terrain | blue | Yderligere
64.083048,-21.943926|/media/3421/dalshraun_01.jpg?w=250&h=109&mode=crop|Office building in Hafnarfjordur|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/office-building-in-hafnarfjordur/| The building at Dalshraun 3 is a five-story office buildings as well as underground parking garage on one floor. In total it is about 5942 m2 with an underground parking of 3.097m2|terrain | blue | Yderligere
64.16461,-21.72772|/media/37532/District_Development_Mosfellsbaer.jpg?w=250&h=109&mode=crop|District Development Mosfellsbaer|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/district-development-mosfellsbaer/| Houses were sold without complete flooring and plot complete with street construction.|terrain | blue | Yderligere
64.147007,-21.942647|/media/27738/HHÍ_Tjarnargata_4.jpg?w=250&h=109&mode=crop|HHÍ - Tjarnargata 4|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/hhi-tjarnargata-4/| |terrain | blue | Yderligere
64.146404,-21.896257|/media/27739/Borgartun_33_endurbygging.jpg?w=250&h=109&mode=crop|Office building - refurbishment|/dk/konstruktion/faerdige-projekter/industrelle-forretnings-kontor-og-boligbyggninger/office-building-refurbishment/| Borgartun 33 was At the start of construction of Borgartun 33 was 2,510 m2 concrete building with office space and shopping centres on three floors plus a basement.|terrain | blue | Yderligere
66.124893,-23.188218|/media/43798/Bol_snjoflod1.jpg?w=250&h=109&mode=crop|Snow avalanche barriers in Bolungarvik|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/snow-avalanche-barriers-in-bolungarvik/| The project consists of a 710 m long transverse avalanche barrier and eight cones placed higher up in the mountain.|terrain | blue | Yderligere
64.167957,-21.683929|/media/27747/Ullarnesbrekka.jpg?w=250&h=109&mode=crop|Main road 1, Hafravatn – Thingvellir|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/main-road-1-hafravatn-thingvellir/| The project involves a doubling of the main road system (1) between the road from Hafravatnsvegur and to the road Þingvallavegar|terrain | blue | Yderligere
64.147562,-21.751897|/media/27748/OR_Strengur.jpg?w=250&h=109&mode=crop|High voltage cable for Reykjavik Energy|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/high-voltage-cable-for-reykjavik-energy/| A 10 km underground 132 kV high voltage cable was layed for Reykjavikk Energy by using horizontal directional drilling tools as well as traditional ditching. |terrain | blue | Yderligere
65.261556,-14.001191|/media/27774/Snjoflodavorn_Seydisfjordur.png?w=250&h=109&mode=crop|Snow avalanche barriers in Seydisfjordur|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/snow-avalanche-barriers-in-seydisfjordur/| The transverse snow avalanche barriers in Seydisfjordur were tendered out and IPC received the project that included building two barriers with filler material, loose material and cut cliffs obtained ...|terrain | blue | Yderligere
63.985038,-22.605864|/media/27778/Flugbrautarljos_KEF.jpg?w=250&h=109&mode=crop|Renewal of Approach Landing Light System|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/renewal-of-approach-landing-light-system/| Renewal of the approach landing light systems in Keflavik international airport.|terrain | blue | Yderligere
66.124893,-23.188218|/media/27776/Oshlid_002.jpg?w=250&h=109&mode=crop|Roadtunnel Bolungarvik - Oshlid|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/roadtunnel-bolungarvik-oshlid/| The rock tunnel is 5,1 km long, and the total length of the portals is approximately 0,3 km, so the total length of the tunnel is 5,4 km|terrain | blue | Yderligere
66.943369,-53.669443|/media/43802/Ulkebugt_01.jpg?w=250&h=109&mode=crop|Bridge over Ulkebugten - Greenland|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/bridge-over-ulkebugten-greenland/| Construction of a 225 meter long bridge over a Ulkebugt fjord in Sisimiut in west Greenland|terrain | blue | Yderligere
64.362616,-21.783976|/media/27763/Nordural_RF25.jpg?w=250&h=109&mode=crop|Extensions for Century Aluminum|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/extensions-for-century-aluminum/| Concrete work, structural steelwork and cladding, electrical utilities, small power and lighting. |terrain | blue | Yderligere
64.949278,-15.80028|/media/27746/Adkomugong_Karahnjukar.jpg?w=250&h=109&mode=crop|Entrance tunnel at Karahnjukar|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/entrance-tunnel-at-karahnjukar/| The entrance tunnel lies under the Karahnjukar dam.|terrain | blue | Yderligere
68.720554,-52.794436|/media/27781/Graenland_flugbraut.jpg?w=250&h=109&mode=crop|Airfield in Aasiaat, Greenland|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/airfield-in-aasiaat-greenland/| Construction of a 799 meter long landingfield in Aasiaat in west Greenland as well as a 5 Km asphalt road from Aasiaat to the airport|terrain | blue | Yderligere
65.004976,-15.019526|/media/27732/Stodvarhus_Fljotsdal.jpg?w=250&h=109&mode=crop|Powerhouse at Karahnjukar|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/powerhouse-at-karahnjukar/| The powerhouse is an underground building approx. 115 m long, 14 m wide and 34 m tall at the highest point.|terrain | blue | Yderligere
64.047993,-22.01903|/media/37531/StraumsvikRTA_Voltage_Raising.jpg?w=250&h=109&mode=crop|Voltage raising project - RTA Straumsvík|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/voltage-raising-project-rta-straumsvik/| Alcan in Iceland which is owned by Rio Tinto Alcan contracted with IAV for civil construction work in connection with the main substation and rectifier buildings.|terrain | blue | Yderligere
63.877222,-22.425599|/media/37530/Metanolverksmidja.jpg?w=250&h=109&mode=crop|CRI - Renewable Methanol Plant|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/cri-renewable-methanol-plant/| IAV has constructed a Methanol plant at Svartsengi, Reykjanes for Carbon Recycling International (CRI), the plant is called GO Plant. |terrain | blue | Yderligere
65.507216,-14.366687|/media/18131/Lagarfossvirkjun.jpg?w=250&h=109&mode=crop|Enlargement of the Lagarfoss Hydro Powerplant|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/enlargement-of-the-lagarfoss-hydro-powerplant/| Extension of the powerhouse in the Lagarfoss hydro power plant, new intake structure, north of the existing one and a concrete penstock.|terrain | blue | Yderligere
64.196525,-19.034375|/media/18132/Vatnsfellsvirkjun.jpg?w=250&h=109&mode=crop|Vatnsfell Hydro Power Plant|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/vatnsfell-hydro-power-plant/| The power plant uses the height difference between Thorisvatn and the reservoir for the power plant at Sigalda|terrain | blue | Yderligere
63.878432,-22.43284|/media/43756/220KV_overhedline.jpg?w=250&h=109&mode=crop|220 kV overhead power line|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/220-kv-overhead-power-line/| The scope of this project was to raise a 220 kV overhead power line from the geothermal plant at Svartsengi to Raudi Melur (Red Gravel).|terrain | blue | Yderligere
63.939717,-17.367956|/media/27773/Gigjukvisl.png?w=250&h=109&mode=crop|Bridge in south Iceland|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/bridge-in-south-iceland/| The length of the bridge is 300 m and the superstructure is all reinforced concrete. The bridge is supported by 7 pillars and the span between the pillars is 50 m.|terrain | blue | Yderligere
64.007641, -22.555808|/media/104884/Ver01.JPG?w=250&h=109&mode=crop|Helguvík - steel pipe factory|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/helguvik-steel-pipe-factory/| A project blasting out for a steel pipe factory.|terrain | blue | Yderligere
64.53544,-18.192507|/media/27729/Hagongumidlun.jpg?w=250&h=109&mode=crop|Hagongur water diversion|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/hagongur-water-diversion/| This project was to build a dam at Koldukvisl east of South-Hagangar, a bottom channel was also a part of the project as well as a bypass dam northwest of South-Hagangar.|terrain | blue | Yderligere
63.878488,-22.432917|/media/27731/Orkuver5.jpg?w=250&h=109&mode=crop|Geothermal Power Plant|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/geothermal-power-plant/| Verkafl, a subsidary of IAV was the main contractor for all groundwork, powerhouse and other buildings in connection with this Hydro Power Plant.|terrain | blue | Yderligere
64.124206,-21.811897|/media/27779/Hofdabakkabru.jpg?w=250&h=109&mode=crop|Hofdabakki bridge|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/hofdabakki-bridge/| Construction of a bridge over the main road, Vesturlandsvegur at Hofdabakki.|terrain | blue | Yderligere
64.129454,-21.931319|/media/5075/Flugstjorn_002.jpg?w=250&h=109&mode=crop|AirTraffic Control Center at Reykjavik Airport|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/airtraffic-control-center-at-reykjavik-airport/| Our task in 2009 was to replace the roof of the building while Control Center was under full operation.|terrain | blue | Yderligere
64.040092, -22.712854|/media/104885/Loka-018.jpg?w=250&h=109&mode=crop|Costal protection|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/costal-protection/| This is one of many coastal protection projects ÍAV has worked on in the Reykjanes penisula.|terrain | blue | Yderligere
64.150340, -21.932230|/media/104886/P9180022.JPG?w=250&h=109&mode=crop|Harbour - Landfill|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/harbour-landfill/| To be able to excavate and build the foundament for the Concert Hall it was necessary to make a sheetpile wall around the buildings perimeter.|terrain | blue | Yderligere
63.992996,-22.629586|/media/104879/Flughlad_grofur.jpg?w=250&h=109&mode=crop|Aprons at KEF airport|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/aprons-at-kef-airport/| IAV was the lowest bidder for the implementation of the second phase expansion of cargo apron as well as other changes.|terrain | blue | Yderligere
64.728062,-15.197175|/media/27762/Saudarveita.jpg?w=250&h=109&mode=crop|Saudarveita water diversion|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/saudarveita-water-diversion/| The access route to the work area is through Fljótdalsvegur where Fljótdalsvegur is seperated into Kárahnjúkavegur and Hraunvegur. The route lies from there through Hraunvegur over a bridge east of Jö...|terrain | blue | Yderligere
64.235371,-19.369097|/media/27764/Budarhals_Fallpipur.jpg?w=250&h=109&mode=crop|Budarhals Hydroelectric project, Penstock|/dk/konstruktion/faerdige-projekter/anlaegsprojekter/budarhals-hydroelectric-project-penstock/| The scope of the work is to design, build and erect two penstocks in the project, incl. interior finishing and providing of flowmetes.|terrain | blue | Yderligere
64.147415,-21.930574|/media/43837/Thjodleikhus2.jpg?w=250&h=109&mode=crop|The National Theater, storage extension|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/the-national-theater-storage-extension/| The state construction agency tendered the project in June 2013. ÍAV was the successful bidder. The project started in August. The theater was in full operation throughout the project and cooperation ...|terrain | blue | Yderligere
64.140006,-21.949806|/media/43766/Haskolatorg02.jpg?w=250&h=109&mode=crop|University Square - enlargement|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/university-square-enlargement/| The extension project of one of the Universities buildings which consists of a reception, book shop, cafeteria and an open hall for dining and studying started July 2012.|terrain | blue | Yderligere
64.150294,-21.932285|/media/27742/Harpa_01.jpg?w=250&h=109&mode=crop|Harpa - Concert Hall and Conference Centre|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/harpa-concert-hall-and-conference-centre/| Our signature construction is the concert and conference hall Harpa in Reykjavik. This 32.000 m2 building is a landmark for Reykjavík by the harbour site, state of the art building with four halls wit...|terrain | blue | Yderligere
64.150294,-21.932285|/media/27737/Harpa_Bilakjallari_torg_2.jpg?w=250&h=109&mode=crop|Harpa - carpark and square|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/harpa-carpark-and-square/| |terrain | blue | Yderligere
64.10446,-22.01878|/media/27829/Ithrottamidstod_Alftanesi1.jpg?w=250&h=109&mode=crop|Sport Center in Alftanes|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/sport-center-in-alftanes/| In December 2007 IAV started on this project which was to build a new outdoor swimmingpool and enlarge the current sportcentre in Alftanes, close to Reykjavik.|terrain | blue | Yderligere
64.139741,-21.950774|/media/27812/Haskolatorg.jpg?w=250&h=109&mode=crop|University square and Gimli|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/university-square-and-gimli/| This project was a turnkey project were for a fixed amount IAV had to design and completely finish the buildings and their surroundings. |terrain | blue | Yderligere
63.994375,-22.554278|/media/27827/Iþrottaakademian.jpg?w=250&h=109&mode=crop|Sports academy in Reykjanesbaer|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/sports-academy-in-reykjanesbaer/| Earth work, concrete work, interior and exterior finishes and landscaping. The building is approx. 2.700 m² partly on two floors. On the ground floor there are lecture halls, classrooms and a large sp...|terrain | blue | Yderligere
65.077553,-14.03785|/media/27821/Sundlaug_Eskifirdi.jpg?w=250&h=109&mode=crop|Swimmingpool in east Iceland|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/swimmingpool-in-east-iceland/| This is a 25 meter long outdoor swimmingpool, gliding pool, shallow pool for kids and main building with dressing rooms and office.|terrain | blue | Yderligere
65.685051,-18.119847|/media/27811/Ransokn_nyskopun_Aey.jpg?w=250&h=109&mode=crop|Borgir - Research and Development Center|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/borgir-research-and-development-center/| The building is 4 - 6 floors with a connecting staircase area for the three parts of the first to forth floor but one part of that area is seven floors.|terrain | blue | Yderligere
64.166228,-21.725249|/media/27813/Lagafelsskoli.jpg?w=250&h=109&mode=crop|Lagafell school in Mosfellsbaer|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/lagafell-school-in-mosfellsbaer/| The first phase was the 5.000m² school building, build in a curve with a 400 m radius. Open spaces are in the building that creates a mood of town squares.|terrain | blue | Yderligere
64.141936,-21.87706|/media/27817/Armann.jpg?w=250&h=109&mode=crop|Sport center in Reykjavik|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/sport-center-in-reykjavik/| The building is on two floors, 3.200 square meters, about 22.600 cubic meters. It is a traditional reinforced concrete building with steel frame structures with so called Lett-tak roofing system.|terrain | blue | Yderligere
65.261991,-14.393202|/media/27819/Leikskoli_Skogarland.jpg?w=250&h=109&mode=crop|Preschool in east Iceland|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/preschool-in-east-iceland/| IAV finished building an addition to the preschool at Skogarstrond in 2005. An additional building was added in 2007.|terrain | blue | Yderligere
64.156428,-21.755286|/media/27816/Sjalandsskoli.jpg?w=250&h=109&mode=crop|Sjalandsskoli in Gardabær|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/sjalandsskoli-in-gardabaer/| IAV built the first and second phase of this school building, an elementary school for the district of Sjaland and Grundir. The first phase was a 4.000 m² school building mostly on two floors.|terrain | blue | Yderligere
64.137296,-21.945845|/media/27822/Askja.jpg?w=250&h=109&mode=crop|Askja – University of Iceland|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/askja-university-of-iceland/| Earth and concrete work and outdoor finishes of a 8.600 m2 teaching facilities on three floors and a technical basement.|terrain | blue | Yderligere
|/media/37529/Reykjaneshollin.jpg?w=250&h=109&mode=crop|Reykjanes Sports Stadion|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/reykjanes-sports-stadion/| This building is the first multi sport indoor stadium. It is over 8000 square meters in total.|terrain | blue | Yderligere
64.146795,-21.940154|/media/27831/Alþingi1.jpg?w=250&h=109&mode=crop|Service building for the Icelandic Parliament|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/service-building-for-the-icelandic-parliament/| Building the service building for the Icelandic Parliament and an underground car park. Earth work, concrete work, exterior and interior finishes and landscaping.|terrain | blue | Yderligere
64.112198,-21.794885|/media/27824/Arbaejarlaug.jpg?w=250&h=109&mode=crop|Community swimming pool|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/community-swimming-pool/| The building sits high at the end of the river valley Ellidaárdalur with a view over the valley.|terrain | blue | Yderligere
64.104466,-22.017684|/media/27823/Álftanesskoli.jpg?w=250&h=109&mode=crop|School in Alftarnes|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/school-in-alftarnes/| This new school for art and craftsmanship in Alftarnes opens many new possibilities for more variety in the school work. |terrain | blue | Yderligere
64.147725,-21.932357|/media/43768/SuprimeCourt.jpg?w=250&h=109&mode=crop|The Supreme Court of Iceland|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/the-supreme-court-of-iceland/| Earth work, concrete work, interior and exterior finishes with custom made furnishings. The Supreme Court of Iceland is a 2.600 m² building on three floors, a basement and an underground car park. The...|terrain | blue | Yderligere
64.068754,-21.95783|/media/27838/Heradsdomur_Reykjaness.jpg?w=250&h=109&mode=crop|Courthouse of Reykjanes|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/courthouse-of-reykjanes/| The earth work, concrete work, interior and exterior finishes of this courthouse in Hafnarfjordur.|terrain | blue | Yderligere
64.144149,-21.900729|/media/27835/Hjukrunarheimilid_Soltun1.jpg?w=250&h=109&mode=crop|Soltun nursing home|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/soltun-nursing-home/| The building is very well equipped with all the best possible facilities for nursing and caretaking of the residents.|terrain | blue | Yderligere
63.996139,-22.623448|/media/27840/Flugstod_Leifs_Eirikssonar.jpg?w=250&h=109&mode=crop|Leifur Eiriksson airport terminal|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/leifur-eiriksson-airport-terminal/| Interior finishes of 15.000 m² new addition to the Leifur Eiriksson airport terminal as well as all mechanical systems.|terrain | blue | Yderligere
63.991692,-22.549496|/media/27756/Nesvellir_RNB.jpg?w=250&h=109&mode=crop|Nursing home in Reykjanes|/dk/konstruktion/faerdige-projekter/offentlige-byggninger/nursing-home-in-reykjanes/| The work commenced in October 2012 and was finished in November 2013, except for few items that was withhold by the buyer, which were finished in February 2014.|terrain | blue | Yderligere
64.025184, -22.577328|/media/125788/CRI_00.jpg?w=250&h=109&mode=crop|Silicon metal factory in Helguvík|/dk/konstruktion/igangvaerende-projekter/silicon-metal-factory-in-helguvik/| Start of 1.st phase of project in august 2014 and expected finish in May 2016.|terrain | yellow | Yderligere
64.326847, -22.061727|/media/121821/Adveitustod_des_14.jpg?w=250&h=109&mode=crop|Power Substation|/dk/konstruktion/igangvaerende-projekter/power-substation/| IAV signed a contract with OR in August 2014 to construct 670 m2 Concrete Building housing client High Voltage Distribution Systems. Total floor area is 1000 m2 at different elevations. The High Vol...|terrain | yellow | Yderligere
59.030404,5.944358|/media/27758/Solbak_01.jpg?w=250&h=109&mode=crop|Subsea tunnel - Stavanger, Norway|/dk/konstruktion/igangvaerende-projekter/subsea-tunnel-stavanger-norway/| Solbakk tunnel is a part of the project Ryfast / Eiganes tunnel which connects Ryfylke and North Jæren in Rogaland together.|terrain | yellow | Yderligere
63.975594, -22.588876|/media/113711/Advania_gagnaver_02.jpg?w=250&h=109&mode=crop|Advania Datacenter|/dk/konstruktion/igangvaerende-projekter/advania-datacenter/| The first part of this project are two 1200m2 datacenters.|terrain | yellow | Yderligere
63.997343, -22.623612|/media/104880/Flugstod_Hanna.jpg?w=250&h=109&mode=crop|KEF airport terminal enlargement|/dk/konstruktion/igangvaerende-projekter/kef-airport-terminal-enlargement/| The project will be to enlarge the air terminals. Building ground area by 1.670 m2. The combined enlargement of lower ground floor, ground floor and first floor will be 5.000 m2.|terrain | yellow | Yderligere
64.099882,-21.696529|/media/126652/Holmsheidi_02.JPG?w=250&h=109&mode=crop|Prison project near Reykjavik|/dk/konstruktion/igangvaerende-projekter/prison-project-near-reykjavik/| The client for the new prison project is the Ministry of the Interior and Framkvæmdasýsla Ríkisins (FSR - Government Construction Contracting Agency)|terrain | yellow | Yderligere
63.997343, -22.623612|/media/125783/FLE_breytingar_00.jpg?w=250&h=109&mode=crop|The departure hall at Leifur Eiriksson International Airport|/dk/konstruktion/igangvaerende-projekter/the-departure-hall-at-leifur-eiriksson-international-airport/| The new layout is designed to meet the needs of new shop and restaurant operators that will commence operations first half 2015. |terrain | yellow | Yderligere
64.051188, -21.987598|/media/126656/Flughermir_002.jpg?w=250&h=109&mode=crop|Flight simulator building|/dk/konstruktion/igangvaerende-projekter/flight-simulator-building/| IAV signed a contract with Iceeignir ehf, subsidiary of Icelandair, in March 2014, to construct a 750 m2 12 m high structural steel building for Icelandair new flight simulator and their emergency re...|terrain | yellow | Yderligere
63.877222,-22.425599|/media/125787/CRI_01.jpg?w=250&h=109&mode=crop|Methanol Plant enlargement|/dk/konstruktion/igangvaerende-projekter/methanol-plant-enlargement/| IAV works on CRI's plant expansion and is expected to be finished i December 2014.|terrain | yellow | Yderligere
59.454297,10.349838|/media/27770/Snekkestad_01.jpg?w=250&h=109&mode=crop|Railway tunnel and tracks in Norway|/dk/konstruktion/igangvaerende-projekter/railway-tunnel-and-tracks-in-norway/| The project Holm – Nykirke has a total length of 14.1 km of double railway tracks from Holm Sande to Nykirke crossing tracks in Re.|terrain | yellow | Yderligere
64.147871,-21.931335|/media/113713/Arnarhvoll_2014.png?w=250&h=109&mode=crop|Old high court refurbishment|/dk/konstruktion/igangvaerende-projekter/old-high-court-refurbishment/| The project involves the removal of loose concrete and repair of all concrete damage, replacement of all windows for new ones in original form. |terrain | yellow | Yderligere
64.156027,-21.9373|/media/113707/Grandi_panorama.jpg?w=250&h=109&mode=crop|Officebuilding HB Grandi|/dk/konstruktion/igangvaerende-projekter/officebuilding-hb-grandi/| The project was successful and in 2013 HB Grandi and ÍAV signed 4 more contracts. First was a contract for phase 1 of HB Grandi’s office extension.|terrain | yellow | Yderligere
64.090526,-21.976568|/media/27752/Alftanesvegur3.jpg?w=250&h=109&mode=crop|Road to Alftanes|/dk/konstruktion/igangvaerende-projekter/road-to-alftanes/| IAV won a contract to build a new road at Alftanes near the capitol area. The road is about 4 km long, with three pedestrian tunnels, crossroad , exits and one roundabout.|terrain | yellow | Yderligere
66.151329,-23.243112|/media/43784/Landsnet_02.jpg?w=250&h=109&mode=crop|Emergency Power Plant Bolungarvík|/dk/konstruktion/igangvaerende-projekter/emergency-power-plant-bolungarvik/| IAV signed a contract with Landsnet (Owns and operates all major electricity transmission lines in Iceland.) in August 2013 to construct 1000 m2 emergency power plant station in Bolungarvik in NW of...|terrain | yellow | Yderligere
66.155584,-18.921904|/media/113694/Siglo_vindur_01.jpg?w=250&h=109&mode=crop|Snow avalanche barriers in Siglufjordur|/dk/konstruktion/igangvaerende-projekter/snow-avalanche-barriers-in-siglufjordur/| The project consists of installation of support structure for avalanche barrier in the mountain above the town Siglufjordur.|terrain | yellow | Yderligere
65.694189,-18.05373|/media/14672/vadlaheidagong.jpg?w=250&h=109&mode=crop|Vadlaheiditunnel|/dk/konstruktion/igangvaerende-projekter/vadlaheiditunnel/| A 7.17 Km long roadtunnel in north Iceland with 320 meter long portals, total of 7.5 Km.|terrain | yellow | Yderligere
64.141757,-21.950571|/media/27757/HusIslenskraFraeda.jpg?w=250&h=109&mode=crop|Hús íslenskra fræða - jarðvinna|/dk/konstruktion/igangvaerende-projekter/hus-islenskra-fraeda-jardvinna/| Grunnur að Húsi Íslenskra fræða er hefðbundið jarðvinnuverk þ.e. uppúrtekt, sprengingar og fyllingar.|terrain | yellow | Yderligere
63.982095,-22.586105|/media/27761/HS_veitur_Vidhald.jpg?w=250&h=109&mode=crop|Geothermal heating distribution|/dk/konstruktion/igangvaerende-projekter/geothermal-heating-distribution/| Maintenance and renewal for electrical, hot- and coldwater supply for HS ORKA.|terrain | yellow | Yderligere
66.074436, -23.144602|/media/113714/isafjordur02.png?w=250&h=109&mode=crop|Avalanche and mud barriers at Isafjordur|/dk/konstruktion/igangvaerende-projekter/avalanche-and-mud-barriers-at-isafjordur/| IAV won a contract with the town of Isafjordur and the Avalanche fund of Iceland.|terrain | yellow | Yderligere
64.146571,-21.924535|/media/27765/Lindargata-37.jpg?w=250&h=109&mode=crop|Lindargata 37 – Exterior work|/dk/konstruktion/igangvaerende-projekter/lindargata-37-exterior-work/| The contract was cooperative contract negotiated between Landey and ÍAV without a tendering phase.|terrain | yellow | Yderligere
64.029162,-22.579947|/media/43865/Helguvik_1.jpg?w=250&h=109&mode=crop|Aluminum smelter in Helguvík|/dk/konstruktion/igangvaerende-projekter/aluminum-smelter-in-helguvik/| IAV signed contract with the aluminum smelter company Century Aluminum (Nordural), the owner, in 2008.|terrain | yellow | Yderligere
Tidligere projekter
Igangværende projekter

Igangværende projekter

Projekt
Igangværende projekter
Silicon metal factory in Helguvík Vis på kort
Power Substation Vis på kort
Subsea tunnel - Stavanger, Norway Vis på kort
Advania Datacenter Vis på kort
KEF airport terminal enlargement Vis på kort
Prison project near Reykjavik Vis på kort
The departure hall at Leifur Eiriksson International Airport Vis på kort
Flight simulator building Vis på kort
Methanol Plant enlargement Vis på kort
Railway tunnel and tracks in Norway Vis på kort
Old high court refurbishment Vis på kort
Officebuilding HB Grandi Vis på kort
Road to Alftanes Vis på kort
Emergency Power Plant Bolungarvík Vis på kort
Snow avalanche barriers in Siglufjordur Vis på kort
Vadlaheiditunnel Vis på kort
Hús íslenskra fræða - jarðvinna Vis på kort
Geothermal heating distribution Vis på kort
Avalanche and mud barriers at Isafjordur Vis på kort
Lindargata 37 – Exterior work Vis på kort
Aluminum smelter in Helguvík Vis på kort

Færdige projekter

Projekt
Industrelle-, forretnings-, kontor- og boligbyggninger
Newspaper officebuilding Vis på kort
Freezer storage building for HB Grandi Vis på kort
Blue lagoon Vis på kort
Warehouse building for Eimskip Vis på kort
Poultry slaughterhouse in Mosfellsbaer Vis på kort
Headquarters of Reykjavik Energy Vis på kort
Office building - Borgartún 26 Vis på kort
Office building Glæsibær Vis på kort
Grand Hotel Reykjavik Vis på kort
Hotel Reykjavik Centrum Vis på kort
N1 Servicestations Vis på kort
ÖL - brewery Vis på kort
Höfuðstöðvar og verksmiðja Lýsi hf Vis på kort
Freezingwarehouse Skinney-Thinganes Vis på kort
Freezing warehouse in Neskaupsstadur Vis på kort
Verne Date Centre Vis på kort
Apartments - interior finishing Vis på kort
Apartments Hrolfsskalamelur Vis på kort
Apartments Soltun & Manatun Vis på kort
Apartments in Hafnarfjördur Vis på kort
Apartment building – Lindargata 27 Vis på kort
Lindargata 37 – Exterior work Vis på kort
Apartments Skuggi Vis på kort
101 Skuggi apartments, 1. phase Vis på kort
Luxury apartments Vis på kort
Office building in Hafnarfjordur Vis på kort
District Development Mosfellsbaer Vis på kort
HHÍ - Tjarnargata 4 Vis på kort
Office building - refurbishment Vis på kort
Anlægsprojekter
Snow avalanche barriers in Bolungarvik Vis på kort
Main road 1, Hafravatn – Thingvellir Vis på kort
High voltage cable for Reykjavik Energy Vis på kort
Snow avalanche barriers in Seydisfjordur Vis på kort
Renewal of Approach Landing Light System Vis på kort
Roadtunnel Bolungarvik - Oshlid Vis på kort
Bridge over Ulkebugten - Greenland Vis på kort
Extensions for Century Aluminum Vis på kort
Entrance tunnel at Karahnjukar Vis på kort
Airfield in Aasiaat, Greenland Vis på kort
Powerhouse at Karahnjukar Vis på kort
Voltage raising project - RTA Straumsvík Vis på kort
CRI - Renewable Methanol Plant Vis på kort
Enlargement of the Lagarfoss Hydro Powerplant Vis på kort
Vatnsfell Hydro Power Plant Vis på kort
220 kV overhead power line Vis på kort
Bridge in south Iceland Vis på kort
Helguvík - steel pipe factory Vis på kort
Hagongur water diversion Vis på kort
Geothermal Power Plant Vis på kort
Hofdabakki bridge Vis på kort
AirTraffic Control Center at Reykjavik Airport Vis på kort
Costal protection Vis på kort
Harbour - Landfill Vis på kort
Aprons at KEF airport Vis på kort
Saudarveita water diversion Vis på kort
Budarhals Hydroelectric project, Penstock Vis på kort
Offentlige byggninger
The National Theater, storage extension Vis på kort
University Square - enlargement Vis på kort
Harpa - Concert Hall and Conference Centre Vis på kort
Harpa - carpark and square Vis på kort
Sport Center in Alftanes Vis på kort
University square and Gimli Vis på kort
Sports academy in Reykjanesbaer Vis på kort
Swimmingpool in east Iceland Vis på kort
Borgir - Research and Development Center Vis på kort
Lagafell school in Mosfellsbaer Vis på kort
Sport center in Reykjavik Vis på kort
Preschool in east Iceland Vis på kort
Sjalandsskoli in Gardabær Vis på kort
Askja – University of Iceland Vis på kort
Reykjanes Sports Stadion Vis på kort
Service building for the Icelandic Parliament Vis på kort
Community swimming pool Vis på kort
School in Alftarnes Vis på kort
The Supreme Court of Iceland Vis på kort
Courthouse of Reykjanes Vis på kort
Soltun nursing home Vis på kort
Leifur Eiriksson airport terminal Vis på kort
Nursing home in Reykjanes Vis på kort