Constructions

64.086640, -21.886549|/media/177088/Vifilsholl00.JPG?w=250&h=109&mode=crop|Vífilshöll – Multiuse Sport hall|/en/constructions/current-projects/vifilsholl-multiuse-sport-hall/| In accordance with the tender documentation, the work consists of total design and erection of the building.|terrain | yellow | Info
63.962223, -21.124186|/media/177086/Hringvegur-1-d6-1-afangi-1.jpg?w=250&h=109&mode=crop|Main Road #1 - South Iceland|/en/constructions/current-projects/main-road-1-south-iceland/| The first part of the widening of Suðurlandsvegur, part of highway nr. one in South Iceland|terrain | yellow | Info
64.150668, -21.791341|/media/172859/Moavegurmai2018.jpg?w=250&h=109&mode=crop|Móavegur 2-12|/en/constructions/current-projects/moavegur-2-12/| Iceland General Contractor constructs a 155-apartment affordable rental-housing complex entailing seven 3-4 storey buildings with shared underground carpark.|terrain | yellow | Info
64.098803, -21.889663|/media/172864/201_loftmynd.jpg?w=250&h=109&mode=crop|Public housing in 201 Smári|/en/constructions/current-projects/public-housing-in-201-smari/| ÍAV takes on the role of contractor guidance in the construction of more than 650 apartments for Smárabyggð. |terrain | yellow | Info
64.105927, -19.805196|/media/163723/BUR0317.jpg?w=250&h=109&mode=crop|Burfell Extension Hydroelectric Project|/en/constructions/current-projects/burfell-extension-hydroelectric-project/| |terrain | yellow | Info
66.074436, -23.144602|/media/150288/Kubbur01.jpeg?w=250&h=109&mode=crop|Avalanche barriers at Isafjordur|/en/constructions/current-projects/avalanche-barriers-at-isafjordur/| The work involves the installation of retaining structures of steel in an avalanche prone areas at Brattahlíð mountain Kubba above Holtahverfi in town of Ísafjörður. |terrain | yellow | Info
63.985041, -22.605461|/media/166335/Malbik01.jpg?w=250&h=109&mode=crop|KEFLAVÍK AIRPORT - Renewal of two 3 km runways|/en/constructions/current-projects/keflavik-airport-renewal-of-two-3-km-runways/| The project is to fix the section of two runways, no: 02-20 and 11-29 at the Keflavik airport by milling the surface and laying out new asphalt, renewing all electrical conduit pipes (PE pipes) and in...|terrain | yellow | Info
64.190880, -21.739998|/media/161846/Alfsnes_03.jpg?w=250&h=109&mode=crop|SORPA – Landfill at Álfsnes|/en/constructions/current-projects/sorpa-landfill-at-alfsnes/| SORPA – Landfill at Álfsnes Plot 20|terrain | yellow | Info
64.025184, -22.577328|/media/161847/Helguvik02.jpg?w=250&h=109&mode=crop|Silicon metal factory in Helguvík|/en/constructions/current-projects/silicon-metal-factory-in-helguvik/| Start of 1.st phase of project in august 2014 and expected finish in May 2016.|terrain | yellow | Info
63.975594, -22.588876|/media/169962/Advania2.jpg?w=250&h=109&mode=crop|Advania Datacenter|/en/constructions/current-projects/advania-datacenter/| The first part of this project are two 1200m2 datacenters.|terrain | yellow | Info
63.997343, -22.623612|/media/142691/FLE_juni_2015.jpg?w=250&h=109&mode=crop|KEF airport terminal enlargement|/en/constructions/current-projects/kef-airport-terminal-enlargement/| The project will be to enlarge the air terminals. Building ground area by 1.670 m2. The combined enlargement of lower ground floor, ground floor and first floor will be 5.000 m2.|terrain | yellow | Info
63.992996,-22.629586|/media/166328/Flughlad.jpg?w=250&h=109&mode=crop|KEFLAVÍK AIRPORT - Aprons|/en/constructions/current-projects/keflavik-airport-aprons/| IAV´s scope of work was excavation, and filling under the new apron, sand traps, oil separators and foundations of light towers.|terrain | yellow | Info
63.997343, -22.623612|/media/170149/Flugskyli_02.jpg?w=250&h=109&mode=crop|Icelandair Hangar Project at KEF Airport|/en/constructions/current-projects/icelandair-hangar-project-at-kef-airport/| |terrain | yellow | Info
64.025184, -22.577328|/media/144413/Stakkur02.jpg?w=250&h=109&mode=crop|Power substation Helguvík|/en/constructions/current-projects/power-substation-helguvik/| IAV is building a 10 meter tall transformer station, 720 square meters for Landsnet.|terrain | yellow | Info
63.997343, -22.623612|/media/142682/FLE06_a.JPG?w=250&h=109&mode=crop|The departure hall at Leifur Eiriksson International Airport|/en/constructions/current-projects/the-departure-hall-at-leifur-eiriksson-international-airport/| The new layout is designed to meet the needs of new shop and restaurant operators that will commence operations first half 2015. |terrain | yellow | Info
64.051188, -21.987598|/media/126656/Flughermir_002.jpg?w=250&h=109&mode=crop|Flight simulator building|/en/constructions/current-projects/flight-simulator-building/| IAV signed a contract with Iceeignir ehf, subsidiary of Icelandair, in March 2014, to construct a 750 m2 12 m high structural steel building for Icelandair new flight simulator and their emergency re...|terrain | yellow | Info
65.694189,-18.05373|/media/163734/VadlaheidiLastBlast-032.jpg?w=250&h=109&mode=crop|Vadlaheiditunnel|/en/constructions/current-projects/vadlaheiditunnel/| A 7.17 Km long roadtunnel in north Iceland with 320 meter long portals, total of 7.5 Km.|terrain | yellow | Info
63.982095,-22.586105|/media/27761/HS_veitur_Vidhald.jpg?w=250&h=109&mode=crop|Geothermal heating distribution|/en/constructions/current-projects/geothermal-heating-distribution/| Maintenance and renewal for electrical, hot- and coldwater supply for HS ORKA.|terrain | yellow | Info
66.074436, -23.144602|/media/144427/Isafj_01.JPG?w=250&h=109&mode=crop|Avalanche and mud barriers at Isafjordur|/en/constructions/current-projects/avalanche-and-mud-barriers-at-isafjordur/| IAV won a contract with the town of Isafjordur and the Avalanche fund of Iceland.|terrain | yellow | Info
59.454297,10.349838|/media/144417/Snekk_areal.jpg?w=250&h=109&mode=crop|Railway tunnel and tracks in Norway|/en/constructions/current-projects/railway-tunnel-and-tracks-in-norway/| The project Holm – Nykirke has a total length of 14.1 km of double railway tracks from Holm Sande to Nykirke crossing tracks in Re.|terrain | yellow | Info
59.030404,5.944358|/media/144389/Solbakkkort.png?w=250&h=109&mode=crop|Subsea tunnel - Stavanger, Norway|/en/constructions/current-projects/subsea-tunnel-stavanger-norway/| Solbakk tunnel is a part of the project Ryfast / Eiganes tunnel which connects Ryfylke and North Jæren in Rogaland together.|terrain | yellow | Info
64.029162,-22.579947|/media/43865/Helguvik_1.jpg?w=250&h=109&mode=crop|Aluminum smelter in Helguvík|/en/constructions/current-projects/aluminum-smelter-in-helguvik/| IAV signed contract with the aluminum smelter company Century Aluminum (Nordural), the owner, in 2008.|terrain | yellow | Info
Finished projects
Current projects