SORPA – Landfill at Álfsnes

The project entails removal of loose soil, blasting of a landfill pit, tipping and construction of drainage canals at the bottom of the pit.

Part of the blasted soil will be crushed and used as a filling for a gas production station which SORPA intends to build at Álfsnes.

Blasting volume is estimated at 385.000 cubic meters as well as excavation and crushing of 50.000 cubic meters of loose soil.

Customer

Sorpa

Project start 3. October 2016
Project finish 31. March 2017
Eartwork ÍAV
Project supervision Stuðull verkfræði- og jarðfræðiþjónusta