In accordance with the tender documentation, the work consists of total design and erection of the building.

This means making of all drawings for both official approval and those that are necessary for erection of the building.

This means design of the premises and all of its systems together with landscape design and the plot of land.

The contractors also delivers equipment for general use.

The new building will be standing on the current Vetrarbraut (Milky Way), a road that connects the residential area Hnoðraholt to the main road at Vífilsstaðir. It is necessary to move the Milky Way road past the construction site before any work on the plot can begin.

The sport Hall is a steelwork frame building covered with metal insulated prefabricated walls and roof. The roof will be covered with grass turf.

Connected on the west and south of the sport Hall is a concrete building. This building will host both necessary locker rooms, showers etc. and utilities for other usages such as cafeteria, offices, multiuse rooms such as dancehall and work out area.

Customer Garðabær Community
Project start 21.12.2018
Project finish 15.04.2021
Architects and landsvaping ASK. Helgi Már Halldórsson
Structural engineering Verkís Consulting Engineers ltd. 
HVAC design Verkís Consulting Engineers ltd.
Electrical engineering Verkís Consulting Engineers ltd.
Project supervision VSB Consulting Engineers ltd.

 

64.086640, -21.886549|/media/177088/Vifilsholl00.JPG?w=250&h=109&mode=crop|Vífilshöll – Multiuse Sport hall|/en/constructions/current-projects/vifilsholl-multiuse-sport-hall/| In accordance with the tender documentation, the work consists of total design and erection of the building.|satellite | yellow | Info