News

09. May 2007

Gullengi Meadow 4 for sale

Apartments in Gullengi Meadow 4 were recently made available for sale. The building is a three-storey multiple-family dwelling with three flats per floor and a separate entry for each flat.

In the basement are storage rooms for each apartment; storage for bicycles, strollers, and prams; and an area for technical facilities. There is also storage space for bicycles and prams on the ground floor. The building stands on a lovely spot close to all essential services, including public schools and retail stores. The apartments will be delivered fully finished, with tiled floors in the bathrooms and laundry rooms but without other floor coverings.

The lot has been finished in accordance with the architectural drawings. Gullengi Meadow 4 is similar to its neighbour, Gullengi Meadow 6, where the last apartments have recently changed hands following brisk sales.

It is expected that the first flats in Gullengi Meadow 4 will be delivered to purchasers at the end of March 2008. 

Twitter Facebook
Go back

Construction in Keflavík is in full swing
24. June 2021

Construction in Keflavík is in full swing

The design phase in Keflavik which began in the middle of September 2020 has now been completed. The permission to commence is expected within the next few weeks. ÍAV received early permission to carry out the earthworks of the apron to ensure that the concrete paving could commence as early in the summer as possible. ÍAV has dug and removed 120.000 cubic metres of soil and rock and imported 100.000 cubic metres of crushed aggregates since March 9th, 2021.

Sky Lagoon handed over
12. May 2021

Sky Lagoon handed over

ÍAV has handed over the Sky Lagoon project to their client Nature Resort ehf. Sky Lagoon was open to the public on May 1, 2021. Sky Lagoon website is www.skylagoon.com

Móavegur 2-12, Progress Report
30. November 2018

Móavegur 2-12, Progress Report

Since contract signing on Feb 16, 2018, a continuous progress is claimed by ÍAV and sub trades on Móavegur 2-12 project site in Reykjavík. The project is to deliver in a turn-key manner a 155-apartment affordable rental-housing complex entailing six 3-4 storey buildings with a shared underground carpark, with anticipated project completion in June of 2020. The Client Bjarg is a non-profit organization formed by two of Iceland’s largest confederations of labour, ASÍ and BSRB.

Project status on Burfell Power Plant expansion.
14. June 2018

Project status on Burfell Power Plant expansion.

Now about 85% of all construction has been completed on the Burfell power plant expansion. All water chanels have been concluded. The entrance chanel was completed late April and the sewerage chanel was completed in beginning of May.